ZEN-NOH SHIP LOADING DOCK
The Zen-Noh Grain dock project showcased Waskey’s proven precast deck design and ability to manage the most challenging logistics. The new loading dock comprised 35,000 SF (2,460 tons) and an access trestle, including 7,500 SF of bridge panels. The entire project was fabricated at Waskey’s yard in Baton Rouge and then delivered by barge via the Mississippi River for ease of installation. Waskey’s sister company, Satco, provided grouting services after the panels were installed.