GEMMA
WASKEY provided 4.5” articulated mats to GEMMA Power Systems as part of a site soil stabilization effort to combat erosion at their facility in Woodville, TX. The mats were applied to various trouble spots including drainage ditches and the banks of a sediment basin. The mats were quickly tested during the 100 year rain event that occurred during the winter of 2013. WASKEY’s mats responded perfectly to the challenge.