All systems have been approved by FERC on various projects and adhere to ACI 318, ACI 350 and HS-20 standards. Waskey’s trench system can be supported by soil or pile caps and is produced to incorporate all turns and intersections. Floors are sloped to client specifications to eliminate man hours after installation. Waskey often incorporates grating, lids, and other accoutrements to provide clients with a turnkey solution. Trenches can be lined with Waskey’s proprietary cryogenic liner to greatly reduce leaking at joints and failure of connections / embedment from cryogenic embrittlement in the case of a chemical spill.