GEMMA

WASKEY provided 4.5” articulated mats to GEMMA Power Systems as part of a site soil stabilization effort to combat erosion at their facility in Woodville, TX. The mats were applied to various trouble spots including drainage ditches and the banks of a sediment basin. The mats were quickly tested during the 100 year rain event that occurred during the winter of 2013. WASKEY’s mats responded perfectly to the challenge.

Products Used in Project