OSHA Recognizes
WASKEY
The Safety and Health Achievement Recognition Program (SHARP) recognizes small employers who operate an exemplary safety and health management system. Acceptance into SHARP by OSHA is an achievement of status that singles out WASKEY as a model for worksite safety and health.
ASCE Sponsorship
WASKEY sponsored the ASCE Baton Rouge Branch Christmas party, Friday December 5th.
See WASKEY's ad on the inside front cover of The Louisiana Civil Engineer.
and long-term costs.
Read more replace expensive
steel products on your project.
Read more WASKEY Bridges install five
times faster than cast-in-place
bridges.
Read more Featured Project
Cheniere Energy
LNG Regasification Platforms
Winner of the American Concrete Institute Louisiana Chapter Best Concrete Projects Award of Merit, the Johnson's Bayou Measurement Facility’s regasification terminal is part of Cheniere Energy’s Creole Trail Pipeline. The terminal uses massive heater equipment to reheat liquefied natural gas, returning it to gas for transportation via pipeline to the southeastern U.S.
Supporting the equipment are two side-by-side WASKEY Platforms that work in tandem, the 150’ x 150’ SW Lateral Platform and the 100’ x 100’ Bridgeline Platform.
The terminal is in a saltwater environment, near the coast in Cameron Parish, LA. The concrete WASKEY platforms on concrete piles provide Cheniere Energy with a
durable, corrosion-resistant solution that is virtually maintenance-free. Both platforms survived a 16' storm surge from Hurricane Ike,
undamaged, in September 2008.
Project Statistics
- A demanding schedule was met at half the cost of steel options.
- 175 tractor trailer loads of WASKEY panels and caps were required.
- The WASKEY panels provided 32,500 square feet of
decking. Cast into the panels were:
- 33 voids for thru-deck equipment access.
- 37 concrete pedestals and pipe supports to elevate above-deck equipment and piping.
- 187 embedded weld plates and bolt clusters to allow equipment and antenna mounting.
- Hundreds of embedded anchor bolts and fittings for handrail mounting.
- Thousands of embedded drains and inserts for both drain line hangers and cable trays.
- WASKEY Surge Ready™ panel-to-cap and Pile Nail™ cap-to-pile anchoring systems were employed to resist wave uplift forces.
Waskey Bridges, Inc. is a custom concrete fabricator, covering Louisiana, Texas, Mississippi, Alabama, and Florida. Call today for a precast platform, precast bridge, Redi-Rock retaining wall, concrete barrier or other precast concrete product.